|
Orphanage Projects
Review details of our current projects below, browse completed projects or see other ways to donate.
There are many more projects that need sponsoring at every orphanage.
Please contact us if you have something specific in mind and we will help you find a project.
Please explore the following options below:
($25 to $500) - sponsor entire project and immediately see the impact!
(over $1,000) - sponsor entire project as a corporation, organization, group or family.
(over $1,000) - join other supporters in addressing the most immediate orphanage needs (see below).
- support an on-going project like the Kostroma Kids Program or the Post-Orphanage Program.
- donate for the future: funding on-going projects and orphanage emergencies.
if you can afford $1 a day! Too many little orphans need your love and compassion!!!
- Honor our fallen friend and supporter.
Current Projects
| Project | Cost | Donated | Need | Donate |
|---|
| $5,495.00 | $5,217.78 | $277.22 | | | $5,550.00 | $3,731.59 | $1,818.41 | | | $11,736.00 | $5,240.03 | $6,495.97 | | | $38,137.20 | $13,405.77 | $24,731.43 | |
Learn more about online donations. See other ways to donate.
Completed Projects
Artem Orphanage #2
Playground Equipment; Cost: $3,750; Completed on 10/25/06.
Children Aid Foundation
Building a boiler plant; Cost: $11,481.10; Completed on 01/30/05.
Christmas Gifts for Orphans; Cost: $2,338.23; Completed on 01/30/05.
Child Protection Foundation
Shower at Day Activities Center; Cost: $654.67; Completed on 09/01/04.
Build a Shower; Cost: $750; Completed on 01/12/04.
Materials for Building Furniture; Cost: $500; Completed on 10/30/03.
Gorlovka Infant Hospital
Replace Windows; Cost: $14,846; In Progress...
Infant Beds & Appliances; Cost: $5329; Completed on 08/17/2007.
Infant Medical Supplies; Cost: $5208.92; Completed on 03/31/07.
Gorlovka Technical Vocational School #35
Refridgerator Repair; Cost: $800; Completed on 6/10/2006.
Gvardeyskaya Boarding School
School Supplies & Shoes; Cost: $5,187; Completed 3/14/2009.
School Supplies; Cost: $500; Completed on 3/30/2008.
Hope Family Commune
Septic System; Cost $6,400; In Progress...
Water Supply System; Cost: $7,513.43; Completed on 6/30/2006.
House; Cost: $1,507.50; Completed.
Fuel for 2006 Agricultural Season; Cost: $4,410; Completed on 7/25/2006.
Converting Old Cow-Barn into Pigpen; Cost: $3,200; Completed 12/1/2005.
Build Cowshed, Coral and Buy Livestock; Cost: $4,589.82; Completed on 11/21/2005.
Fuel for 2005 Agricultural Season; Cost: $2,193; Completed on 06/30/2005.
Minivan; Cost: $5,500; Completed on 06/15/05.
Electric Power Supply; Cost: $5,488; Completed on 10/30/04.
Gas and Oil for 2004 Season; Cost: $1,651.20; Completed on 06/24/04.
Washing Machine; Cost: $425; Completed on 02/15/04.
Cooking Stoves; Cost: $500; Completed on 12/31/03.
Build a Shower; Cost: $600; Completed on 10/16/03.
Horol Orphanage
Linoleum; Cost: $3,415; In Progress...
Irkutsk Orphanage #2
Beds; Cost $6,050; Completed on 3/16/2008.
Montessori; Cost: $8,800; Completed on 3/16/2008.
Makeevka Snowdrops
Dormatory and Appliances; Cost: $6,200; Completed on 6/01/07.
Olga Orphanage
Replace Windows; Cost: $5,100; Completed on 6/30/2008.
Bathroom and Heating System; Cost: $2,800; Completed on 2/15/2007.
Washing Machine & Appliances; Cost: $2,400; Completed 12/31/2007
Pokrovka Orphanage
Windows, Doors and Linoleum Floor; Cost: $5,050; Completed
Toilets, Sinks and Washing Machine; Cost: $1,800; Completed on 07/21/2005.
Serzhantovo Orphanage
Summer Sports Equipment; Cost $2,630; Completed 9/30/2008.
Musical Instruments; Cost $1,800; Completed 3/24/2008.
Repair Dining Room; Cost $3,898; Completed 12/31/2007.
Tennis Table; Cost $500; Completed 11/20/2007.
Books, Medicine, Washing Machine & Garden Supplies; Cost $5,905.79; Complete 9/01/2007.
Doors & Entry Way; Cost: $2,570; Completed on 2/15/2007.
Bathroom for the Older Orphans; Cost: $7,495.97; Completed on 9/13/2006.
Food Service and Dining Facilities; Cost: $4,500; Completed on 6/30/2006.
Bathroom for the Little Orphans; Cost: $5,020; Completed on 6/30/2006.
Medicine & Medical Supplies; Cost: $2,950.31; Completed on 3/17/2006.
Laundry Facility; Cost: $2,300; Completed on 10/31/05.
Prepare for School; Cost: $2,845.84; Completed on 10/02/2005.
Replace Cooker and Stove; Cost: $1,920; Completed on 5/31/2005.
Schors Boarding School
Appliances; Cost: $3,030; Completed on 04/24/2008.
Shpola Orphanage
Medical Supplies; Cost: $2,060; Completed on 01/10/2008.
Snezhnoye Orphanage
Replace Boiler; Cost: $3,550; In Progress...
Water Supply & Furniture; Cost: $5,313; Completed on 10/25/2006.
SOGU
Water Purification System; Cost: $5,420; Completed on 06/06/2008.
Torez Internat
School Supplies; Cost: $3,080.00; Completed 6/01/07.
Torez Special Needs Orphanage
Challenge Grant; Cost: $10,907.50; In Progress...
Physical Therapy Equipment; Cost: $4,709; Completed on 4/4/2008.
Medical Ward; Cost: $8,854.49; Completed on 10/24/06.
Urik Shelter
Beds & Winter Equipment ; Cost: $5,800; Completed on 3/25/2008.
Vladikavkaz Central Regional Clinic
Physical Therapy; Cost: $5,000; Completed 12/5/2009.
Vladivostok Orphanage for Infants
More Heaters; Cost: $2,548; Completed on 10/24/04.
Heaters; Cost: $2,577; Completed on 03/11/04.
Washing Machine; Cost: $506.65; Completed on 12/31/03.
Vladivostok Orphanage #1
2008 Christmas Gifts; Cost: $1,662.66; Completed 1/31/2009.
2007 Christmas Gifts; Cost: $2,764.27; Completed 1/31/2008.
2006 Christmas Gifts; Cost: $4544.08; Completed 1/31/2007.
Furniture & Washing Machine; Cost: $2,800; Completed 7/27/2006.
Windows; Cost: $5,200; Completed 7/6/2006.
Replace Doors; Cost: $6,655; Completed 3/15/2006.
Furniture & Tile; Cost: $4,040; Completed 3/01/2006.
2005 Christmas Gifts; Cost: $6,413.38; Completed 1/15/2006.
Repair Minivan; Cost: $1,140.18; Completed on 8/31/2005.
Hepatitis Vaccination; Cost: $1,560; Completed on 08/18/2005.
Water Heaters; Cost: $1,900; Completed on 07/15/2005.
More Appliances; Cost: $3,002.39; Completed on 07/15/2005.
Sports Equipment; Cost: $2,325; Completed on 06/31/2005.
Montessori Educational Materials; Cost: $3,416; Completed on 05/12/2005.
Appliances; Cost: $4,892.50; Completed on 10/18/04.
|